AWP Best Practices - High Level Diagram
Search
01 AWP Project Kick-off
02 Path of Construction Work Shops
03 Path of Construction Development
04 Engineering Alignment with CWPs
05 Procurement Alignment with CWPs
06 Fabrication Alignment with CWPs
07 Consolidate and Validate Matls by CWP
08 Master Project Schedule by CWP
09 Engineering Delivery by EWP
10 Establish AWP Org, Process & Systems
11 Procurement Delivery Prioritized by PWP
12 Fabs Delivery Prioritized by CWP Seq
13 Scope & Seq Optimal L4 CWPs
14 Feasibility Analysis by Work Package
15 Release IFC EWP Packages
16 Subcontractor Enablement in WFP
17 CWP Readiness Reviews
18 IWP Scoping & Sequencing
19 Constraint Identification & Removal
20 Short Interval Production Control
20.1 Manage IWP in Look-ahead Schedule
20.2 Breakdown IWPs into Task Sequencing
20.3 Request & Stage Material by IWP
20.4 Optimize Scaffold Across IWP
20.5 Production Control in Weekly Work Plans
20.6 Component Level Progressing
21 Driving IWP Close-out
22 Streamlining Inspection & Testing
23 STP Development
24 Prioritization of Work Scope by STPs
25 STP Execution & Handover
Menu
01 AWP Project Kick-off
02 Path of Construction Work Shops
03 Path of Construction Development
04 Engineering Alignment with CWPs
05 Procurement Alignment with CWPs
06 Fabrication Alignment with CWPs
07 Consolidate and Validate Matls by CWP
08 Master Project Schedule by CWP
09 Engineering Delivery by EWP
10 Establish AWP Org, Process & Systems
11 Procurement Delivery Prioritized by PWP
12 Fabs Delivery Prioritized by CWP Seq
13 Scope & Seq Optimal L4 CWPs
14 Feasibility Analysis by Work Package
15 Release IFC EWP Packages
16 Subcontractor Enablement in WFP
17 CWP Readiness Reviews
18 IWP Scoping & Sequencing
19 Constraint Identification & Removal
20 Short Interval Production Control
20.1 Manage IWP in Look-ahead Schedule
20.2 Breakdown IWPs into Task Sequencing
20.3 Request & Stage Material by IWP
20.4 Optimize Scaffold Across IWP
20.5 Production Control in Weekly Work Plans
20.6 Component Level Progressing
21 Driving IWP Close-out
22 Streamlining Inspection & Testing
23 STP Development
24 Prioritization of Work Scope by STPs
25 STP Execution & Handover
00 – AWP- Best Practices – High Level Diagram